|
Both member and nonmember consultant firms may submit entries for consideration in the "preliminary" phase of the Engineering Excellence Awards competition. Only those entries qualified in the preliminary phase will be eligible for submission in the ACEC/MD final awards program and the ACEC national competition. Entries may deal with any one of 12 categories shown below, which are also presented in the national awards brochure.
CATEGORY A: Studies, Research and Consulting Non-design services, projects not involving the preparation of construction documents New products, materials and technologies Expert testimony Basic research and studies Computer/software technology Technical papers Public outreach/ involvement Water conservation Security plans Project feasibility, economic, or risk studies Value engineering |
CATEGORY B: Building/Technology Systems Mechanical/electrical/ plumbing Computer/technology Communications Acoustics Software systems Sustainability or carbon neutrality Efficiency certification standards, e.g. LEED Energy efficiency - new and retrofit Secure facilities (military, research, correctional) |
CATEGORY C: Structural Systems Foundations Tunnels Buildings Seismic design Towers Bridges Stadiums |
CATEGORY D: Surveying and Mapping Technology Geometrics, ALTA, land title and rights surveys Control, GPS, monitoring or construction surveying Survey mapping, GIS/ LIS, photogrammetry |
CATEGORY E: Environmental Hazardous waste Solid waste Restoration/reclamation/ remediation Air quality Noise Recycling Waste pond management Carbon sequestration and trading Mitigation |
CATEGORY F: Water and Storm Water Wastewater collection/ treatment and disposal Residuals management and reuse Graywater systems CSO’s Mine tailings Agricultural Storm water management Erosion control |
CATEGORY G: Water Resources Hydraulics, hydrology Surface and groundwater supply development Treatment Transmission, distribution & storage Watershed management Water use reduction Flood risk management Climate adaptation Coastal and eco-system restoration Locks/dams/water control structures Irrigation |
CATEGORY H: Transportation Highways Rail Airports Marine/ports Public transit Intermodal facilities |
CATEGORY I: Special Projects Safety and security Corrosion protection/cathodic protection Program and construction management Land development Trenchless technologies Recreational facilities Subsurface engineering |
CATEGORY J: Small Projects Total project construction budget does not exceed $2.5 million (At the entrant’s discretion, except for entries in Category A, projects under $2.5 million are not limited to this category.) |
CATEGORY K: Energy Transmission and distribution Power generation Renewable energy Cogeneration Energy storage technologies Energy usage reduction programs Demand side management |
CATEGORY L: Industrial and Manufacturing Processes and Facilities Petrochemical Biotech Manufacturing Heavy industry Industrial waste Materials handling Mining, metallurgy, mineralogy |
The entering firm must select one category, which is most appropriate, in which it wishes to compete. A project may be entered only once in a particular category. However, after a project entered in Category A has been constructed, it may be entered in another year in B, C, D, E, F, G, H, I, J K or L in the year when eligible.
|